Solution

Position:Homepage|Solution

Aluminium silicone protective film coating requirements of automotive headlamps lighting system

Author: ComeFrom: Date:2016-01-12 16:38:20 Hits:4425
1) required equipment: UV series coating production line +ZFG-1800S full automatic light protective film coating equipment
2) get the film: high reflectivity metal aluminum film + silicone oil protective film coating (vacuum chamber in vivo)
3) coating process: the headlight bottom material (ABS, BMC) pretreatment cleaning, primer coating (coating uv paint), vacuum ion cleaning, Al plating, plating inside a cavity of the oil film disposable vacuum completed, a vacuum furnace, product packaging
4) basic configuration:
1.ZFG-1800S lamp protective film coating equipment
Cavity structure: D1800mm*H2000mm, vertical double door
Cavity material: 304 stainless steel
Ion cleaning: bombardment transformer + aluminum ion source
Evaporation power supply: SCR silicon controlled rectifier + high power evaporation transformer
Evaporation source resistance: 56 groups (double)
Silicone oil flow valve: MKS full import
Oil flow valve: MKS Silicone
Silicone oil loading device: SUS304 stainless steel
Pumping system: 2 sets of diffusion pump +1 Taiwan roots pump +2 Taiwan rotary piston pump +1 rotary vane pump
Intelligent control: PLC+HMI intelligent man-machine interface control + alarm system
Control:PLC+HMI+Alarm system Intelligent
Installation services: free installation and commissioning of the customer site service
Warranty service: free 12 month warranty
Training services: provide the basic training service for customers.
2.UV series painting production line
Wire material: stainless steel or high quality carbon steel mesh belt transmission
Spraying table configuration: equipped with screen spray Taiwan, explosion-proof motor, explosion-proof fluorescent lamp
Spray gun body: can use manual spray gun spray mode or full automatic ABB Painting Robot Spraying
Fan system: the allocation of exhaust fan, fan fan, centrifugal fan system
Infrared system: a reasonable configuration of infrared heating length, using the latest research and development of the infrared heating tube
UV solid: full angle UV curing device, multi group UV lighting system
Transmission system: high power transmission motor, mesh belt conveyor system, variable frequency control transmission speed
Installation services: free installation and commissioning of the customer site service
Warranty service: free 12 month warranty
Training services: provide the basic training service for customers.
5) demand supporting facilities:
Screw type air compressor + cold dryer dryer + + filter + + water pump cooling tower
Hydraulic flow rate: 3m3/h 0.2Mpa
Air pressure: 0.4-0.8mpa
Water temperature: less than 25
Link:Nothing
Kun Shan Puyuan Vacuum Technology Engineering Co.,ltd Copyright 2016 All Rights Reserved
 Technical Support:KSGUOCHENG  Sue ICP 16002609  Login